Photovoltaic Power Generation System at Fuji Xerox Ebina Factory
Winner
Fuji Xerox Co., Ltd.
Kajima Corp.
Features of Equipment, Systems and Facilities
PV power generation system of 100kW capacity is installed on
the factory roof.
The horizontal installation in compliance with the roof geometry
allowed installing 4 time as much power output per unit area
in comparison to the conventional installation.
The roof-integrated system used strong aluminum metal frame
and waterproof function, and reduced the installation cost by
30 %.
Horizontal installation
The horizontal installation allows reducing the construction
cost and effective utilization of limited area of factory
roof, in comparison to the conventional tilted installation.
The power generation is kept high in summer when the solar
altitude is high, contributing to coping with the peak demand
for grid power.
Harmonious design
The horizontal installation allows the PV power generation
modules to be integrated to the factory roof without disrupting
the exterior design, which may be readily approved by architects
and designers. This concept will trigger large scale spread
of PV power generation systems in many factories and warehouses.
Environment-friendly Construction Works
Efforts are paid to moderate impacts of construction works
to the environment, and reusable containers are used for
transporting building materials.